Thameslink Upgrade

Thameslink Upgrade

SIDOS (UK) Ltd – Security Consultancy

Security Consultancy & Design

Transport for Wales Early intervention of this project ensured that security was thought of enhancing the environment in the design stage.

Chris’s input into developing and refining the physical security requirements and assurance process of the end design solutions for the Elizabeth line was invaluable. As a key member of my team Chris took a pragmatic approach to ensuring proportionate measures were adopted via considered risk assessments. Chris was sympathetic to the architectural point of view and worked cooperatively and closely with designers and contractors to enable delivery of a high quality architecture and urban design response that met strict security requirements.